Example Asbestos Removal Projects in South Gate

The seven example jobs below are set in South Gate, Cudahy and Montebello. Each one lists what was sampled, what came out, the work days and an estimated cost.

Plaster and lath removed from a dining room wall before an archway is cut

Example project

Home
1920s bungalow in South Gate with plaster-and-lath walls between the dining room and the living room
Original request
Cut an archway through the dining room wall to open the two rooms
Testing
A Cal/OSHA-certified asbestos consultant samples the plaster, the skim coat and the joint compound at the old patches
Found
Asbestos in the skim coat over the plaster
Clear
The base plaster and the patch compound
Area
About 70 sq ft of wall around the new opening
Timeline
Less than 100 square feet of renovation, so no district notice, then one working day
Cost
$2,000

Scope of work

Plastic along the floor and doorways, the skim coat and plaster removed wet in the strip for the archway, bagging, a cleanup and the haul. The survey, the framing, the clearance air test and the plaster repair are separate.

Project overview

In this example, the owners of a 1920s bungalow in South Gate want an archway where a solid wall now divides the dining room from the living room. The wall is plaster over wood lath, patched more than once.

The survey rule does not reach less than 100 square feet of renovation in a single-unit house, yet the owners have the wall sampled first. The skim coat tests positive, so the abatement crew takes the strip out wet before the framer cuts the opening.

The goal

The goal is an archway cut through a wall whose skim coat has already been removed.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wall in four places.
  2. Results The skim coat is positive and the base plaster is clear.
  3. Work day The dining room is sealed and the strip is removed wet and bagged.
  4. Then The framer cuts the archway and sets the header.

Planning right

  • Take pictures and mirrors off both sides of the wall.
  • Mark the width of the arch for the crew.
  • Keep the lab report with the remodel plans.
  • Plan the plaster repair for after the framing.

Get a free quoteMore about drywall, joint compound and plaster removal

Wrapped ducts removed from under a raised-foundation house

Example project

Home
1940s raised-foundation house in South Gate with its ducts hung in the crawlspace
Original request
Install a new furnace and a new set of ducts under the floor
Testing
A Cal/OSHA-certified asbestos consultant samples the wrap on the main run, two elbows and the seam tape
Found
Asbestos in the wrap on the main run and the elbows
Clear
The seam tape
Area
About 220 ft of duct in the crawlspace
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$4,500

Scope of work

The crawlspace vents and the access hatch sealed, wet removal of the wrapped duct into labeled bags, a cleanup and the haul. The survey, the clearance air test and the new furnace and ducts are separate.

Project overview

In this example, the owner of a 1940s raised-foundation house in South Gate is replacing the furnace and every duct under the floor. Removing the old ducts counts as renovation, so the survey comes before the heating crew goes under the house.

The wrap on the main run and the elbows tests positive. The abatement crew takes the old run out first, and the heating crew installs the new ducts in a cleaned crawlspace.

The goal

The goal is a crawlspace with the wrapped ducts gone, so the new system is installed with nothing positive left under the floor.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap from the access hatch.
  2. Before work The contractor files the district notice online and the heating crew holds its date.
  3. Days one and two The crawlspace is sealed and the duct run is wetted, cut apart and bagged.
  4. Last An independent consultant tests the air, then the new system goes in.

Planning right

  • Clear the area around the access hatch.
  • Ask the heating crew to start after the air test.
  • Keep the lab report with the system papers.
  • Plan for the house to be without heat for a day or two.

Get a free quoteMore about HVAC duct and pipe insulation removal

Bathroom floor tile removed from a duplex unit after the walls tested clear

Example project

Home
1940s duplex in Cudahy, one side being updated while the other stays occupied
Original request
Redo the bathroom walls and floor in the vacant unit
Testing
A Cal/OSHA-certified asbestos consultant samples the floor tile, its mastic and the wall compound
Found
Asbestos in the floor tile and the mastic
Clear
The bathroom wall compound
Area
About 55 sq ft of bathroom floor
Timeline
Less than 100 square feet of renovation, so no district notice, then one working day
Cost
$1,900

Scope of work

Samples of the tile, mastic and walls, the bathroom sealed, the tile lifted and the mastic removed wet to the subfloor, bagging, a cleanup and the haul. The clearance air test, the new walls and the new floor are separate.

Project overview

In this example, the owner of a Cudahy duplex is redoing the bathroom in the empty unit while the household in the other unit stays in place. The walls and the floor are both going to be opened.

The floor tile and its mastic test positive, and the wall compound is clear. The abatement crew removes the floor in a day with the room sealed, and the remodel crew handles the walls as ordinary work.

The goal

The goal is a bare bathroom subfloor, with the wall work free to go ahead as ordinary remodeling.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the floor and the walls.
  2. Results The floor tile and mastic are positive and the walls are clear.
  3. Work day The bathroom is sealed, the tile is lifted by hand and the mastic comes off wet.
  4. Then An independent consultant tests the air and the remodel crew begins.

Planning right

  • Tell the other unit’s household the work day in advance.
  • Keep the bathroom door shut once the crew has sealed it.
  • Hold the new tile order until the air results.
  • Keep the lab report with the building records.

Get a free quoteMore about floor tile and mastic removal

Ceiling texture removed from a living room and hall before a repaint

Example project

Home
1960s house in Montebello with a textured ceiling across the living room and hall
Original request
Smooth the ceilings and repaint the living room and hall
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture at three spots
Found
Asbestos in the ceiling texture
Area
About 330 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,400

Scope of work

Three samples, the district notice, the living room and hall sealed with air filters running, the texture soaked and scraped into bags, a HEPA clean and the haul. The clearance air test and the smoothing and paint are separate.

Project overview

In this example, the owners of a 1960s house in Montebello want flat ceilings in the living room and hall before they repaint.

All three samples test positive. The abatement crew removes the texture from both spaces in one visit, and the painter finishes the bare ceilings afterwards.

The goal

The goal is bare ceilings in both spaces, so the smoothing and paint go on over finished surfaces.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling in the living room and the hall.
  2. Before work The abatement contractor files the district notice online and the owners clear both spaces.
  3. Day one Both spaces are sealed and the texture is soaked and scraped into bags.
  4. Day two The ceilings are wiped down and an independent consultant tests the air.

Planning right

  • Take everything off the floors and walls the day before.
  • Plan where to sleep for the work days.
  • Book the painter for after the air results.
  • Keep the lab report with the house papers.

Get a free quoteMore about popcorn ceiling removal

Wall and ceiling materials removed before a bearing wall comes out

Example project

Home
1950s house in South Gate with a wall between the kitchen and the dining room that carries the roof framing
Original request
Take the wall out for an open kitchen
Testing
A Cal/OSHA-certified asbestos consultant samples the wall plaster, the ceiling texture and the kitchen sheet vinyl
Found
Asbestos in the ceiling texture along the wall and in the vinyl backing
Clear
The wall plaster
Area
About 90 sq ft of ceiling and 110 sq ft of kitchen floor
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$3,900

Scope of work

Samples of each material, the district notice, the kitchen and dining room sealed with air filters running, the ceiling texture and the vinyl removed wet, bagging and the haul. The survey, the clearance air test, the beam and framing and the new floor are separate.

Project overview

In this example, a South Gate family is opening the kitchen into the dining room of a 1950s house. The wall carries part of the roof, and under the district rule taking out a load-supporting wall is demolition, so the notice is needed even though the area is small.

The ceiling texture along the wall and the vinyl backing test positive. The abatement crew clears them first, and the framers put in the beam once the air results come back.

The goal

The goal is a wall removed after the positive materials around it are gone, so the framers work in clean rooms.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wall, the ceiling and the floor.
  2. Before work The contractor files the district notice online.
  3. Days one to three Both rooms are sealed and the ceiling texture and vinyl come out wet.
  4. Last An independent consultant tests the air, then the framers shore the roof and take the wall out.

Planning right

  • Empty the cabinets along the wall before work.
  • Ask the engineer or framer to hold the beam date until the air results.
  • Keep the district notice and the lab report together.
  • Cook elsewhere while the two rooms are sealed.

Get a free quoteMore about renovation and demolition abatement

Stucco cut out around two windows that are being enlarged

Example project

Home
1940s stucco house in South Gate with two small front windows
Original request
Enlarge two front windows, which means cutting back the stucco around each opening
Testing
A Cal/OSHA-certified asbestos consultant samples the stucco coats and the caulk at both windows
Found
Asbestos in the finish coat at one window
Clear
The finish coat at the other window and the caulk
Area
About 40 sq ft of stucco around the two openings
Timeline
Less than 100 square feet of renovation, so no district notice, then one working day
Cost
$2,400

Scope of work

Plastic along the wall and the ground, the stucco cut out wet around each opening, bagging, a cleanup and the haul. The survey, the framing, the new windows and the stucco patch are separate.

Project overview

In this example, an owner in South Gate is enlarging two front windows of a 1940s stucco house. The stucco around each opening has to be cut back before the new frames go in.

The finish coat tests positive at one window and clear at the other. The abatement crew cuts back both openings wet, so the window installer works in material that has been dealt with.

The goal

The goal is cleanly cut openings, so the new windows go into stucco that has been sampled and handled.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the stucco and the caulk at both windows.
  2. Results One finish coat is positive, the other and the caulk are clear.
  3. Work day Plastic goes up and the stucco around both windows is cut out wet and bagged.
  4. Then The framer and window installer open the walls.

Planning right

  • Move cars and planters away from the front wall.
  • Mark the new window sizes before the crew arrives.
  • Hold the window order until the openings are cut.
  • Keep the lab report with the window papers.

Get a free quoteMore about renovation and demolition abatement

Closet walls, ceiling and floor sampled before a bedroom closet becomes a bathroom

Example project

Home
1950s house in South Gate with a front bedroom closet next to the hall bathroom wall
Original request
Turn the front bedroom closet into a second bathroom
Testing
A Cal/OSHA-certified asbestos consultant takes eight samples of the closet plaster, ceiling texture, floor covering, mastic and the shared wall
Found
Asbestos in the closet floor covering and its mastic
Clear
The plaster, the ceiling texture and the shared wall
Timeline
Samples, then lab results, then a short report
Estimated testing cost
$650

Scope of work

A visit by the consultant, eight samples, a lab result for each and a short report that marks the sample spots. Removing the closet floor is priced on its own.

Project overview

In this example, a South Gate family is giving up a bedroom closet for a second bathroom in their 1950s house. The plumber needs the closet floor and the shared wall opened.

The closet floor covering and its mastic test positive and the rest is clear. The report shows each result, and the abatement crew is booked to remove the floor before the plumber opens the wall.

The goal

The goal is a list of what is in the closet before it is opened, so the new bathroom starts clean.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the closet and the shared wall.
  2. Results The lab reports each sample, with the floor covering positive and the rest clear.
  3. Next The abatement crew is booked to remove the floor.
  4. Then The plumber starts on the new bathroom.

Planning right

  • Empty the closet and the shelves above it.
  • Ask the consultant to mark each sample spot in the report.
  • Hold the plumber until the floor is out.
  • Keep the report with the plumbing plans.

Get a free quoteMore about asbestos testing and surveys