Kitchens and baths
In a kitchen or bath gut job, the floor, walls and ceiling are surveyed together. Whatever tests positive comes out first, and then the builder begins on the new layout.
Typical cost in South Gate
Before a remodel opens walls or a house comes down, we remove the asbestos material the survey found. A district notice goes in first when the job needs one.
We take on a single room, a whole-house gut or a teardown. We handle the asbestos part while your builder or demolition contractor handles the rest.

In a kitchen or bath gut job, the floor, walls and ceiling are surveyed together. Whatever tests positive comes out first, and then the builder begins on the new layout.
Pulling out a bearing wall makes the job a demolition under Rule 1403, so the district notice has to go in ahead of the work.
Cutting a new opening or joining an addition disturbs old finishes. The survey covers what the work will open, and the plan names each material.
A teardown requires both the survey and the district notice before work starts, even when the survey finds no asbestos. Our part is the asbestos removal, and your demolition contractor takes over from there.
Two filings matter on a demolition job, the district notice and the permit from the local building department.
We file the notice for you online, using the Rule 1403 Notification Web Application, no later than 10 working days before demolition begins. A fee is part of the filing, and without it the notice is not considered received.
The local building and safety office comes into it as well. According to the district, a state law requires a demolition permit applicant to give that office a copy of the South Coast AQMD notification. The building department can explain the process for your address.
Outside planned non-scheduled programs, a renovation removing less than 100 square feet of surface area of asbestos-containing material needs no district notification, in any building type. Demolition gets no such relief, and work practices and waste rules apply either way.
Two checks cover a crew. Ask about the Cal/OSHA registration, which the employer holds and which has to be in place before an asbestos job of 100 square feet or more starts. Then look the license up with the Contractors State License Board. For asbestos work involving 100 square feet or more, the license must list the C-22 Asbestos Abatement classification, or the qualifier must have passed the asbestos certification exam.
For sampling details see asbestos testing and surveys, or start from the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (562) 635-8314